True Food Kitchen - Alpharetta, GA

The project consisted of turning 5,800 SF of in line retail space into a restau­rant. The scope of work included MEP/FP design. The Mechanical design included HVAC, makeup air systems, exhaust systems for kitchens and toilet rooms, general supply, return & ex­haust duct work and registers, natural gas supply systems, temperature con­trol systems, and miscellaneous unit heaters. The Electrical design included re­view of existing electrical service entrance from the local utility company to a point of five feet outside building, tenant space electrical distribution sys­tems, feeders and branch circuiting for equipment, appliances, wiring devic­es, emergency/standby power supply systems, interior and building-mount­ed exterior lighting and controls, fire alarm and detection system, raceways for telecommunications, A/V, and security cabling and equipment. The Plumbing design included reviewing existing domestic, sanitary, waste, and vent sys­tems, domestic hot water system, grease trap system, and natural gas supply system to accommodate building and kitchen load requirements.

Services:

  • Mechanical
  • Electrical
  • Plumbing
  • Fire Protection