MEPIS was commissioned to provide Schematic Designs for the MEP/FP systems. The schematic design package included the complete buildout of the first and third floors. All other floors will be designed as shell space. First floor spaces included lobby, imaging, and equipment storage rooms. Third floor spaces included procedure rooms, operating rooms, and support area. All central equipment, including air handling units, heating plant, cooling plant, medical gases, electrical distribution, emergency power, fire alarm system, information technology, plumbing booster pump, domestic water heater, fire protection pump, fire protection risers will be sized for the entire facility. Tie-ins to the central systems will be terminated in shell spaces for future connections.
Services:- Mechanical
- Electrical
- Plumbing
- Fire Protection