MEPIS was commissioned by Middough for the renovation of an existing laboratory located in the Billings Hospital. MEPIS surveyed and documented the existing Mechanical, Electrical, Plumbing systems within the project area to ensure accuracy. The Mechanical scope included evaluating existing system capacity and ability to service renovated spaces and indicate Chicago code ventilation requirements on plans, design of new ventilation (supply, return, exhaust) as required, and design of temperature control systems (local thermostats only). The Electrical scope consisted of design modifications of interior building lighting/controls, branch circuiting for equipment, appliances, wiring devices, raceways for telecommunications, A/V, fire alarm/security cabling, and equipment as required. The Plumbing scope was made of demolition of plumbing systems (e.g. domestic hot/cold water, waste, vent). Fire Protection included modifications to existing sprinkler head layouts as required.